Happenings

  • EPM Fishing Competition 2024

    EPM Fishing Competition 2024, organized by EPM Sports Club, was held on 7 September 2024 at Fishion Fishing Pond, Desa Kemuning, Shah Alam. EPM staff tested their fishing skills in this sport and managed to reap some good catches. The Grand Winner of this competition goes to Mr. Sam Lim with his catch recording 6.98kg….

  • ISO/IEC 17025:2017 Laboratory Internal Auditing Training

    A two-day training about ISO/IEC 17025:2017 Laboratory Internal Auditing was arranged on 5th and 6th September 2024 at Ebara Pumps Malaysia Sdn Bhd (EPM) for our internal auditors. Trainer Ms. Yong Bee Chee from SGS (Malaysia) Sdn Bhd was invited to conduct this training, sharing the general requirements for the competence of testing and calibration…

  • SIRIM Surveillance Audit

    Surveillance audit was arranged on 5 August 2024 at Ebara Pumps Malaysia Sdn Bhd (EPM) to ensure Ebara Compact Booster AM-PC continues to comply with the SIRIM standards. Mr. Mohd Afiq Aizat from SIRIM QAS International Sdn Bhd conducted this audit. EPM make efforts to maintain high standards of our products thus quality is assured.

  • Hydro Booster System Testing

    Ebara Pumps Malaysia Sdn Bhd (EPM) welcomed visitors from Epsilon Jurutera Perunding ‘Sarawak’ Sdn Bhd and Group Engineers Malaysia Sdn Bhd on 18th & 19th July 2024 for Ebara hydro booster system testing. Performance testing was conducted on 3UEMP EVMSG5 4F5/0.75, 3UEMP EVMSG5 7F5/1.5, and 3UEMP EVMSG20 6F5/7.5.

  • Water Malaysia 2024

    Water Malaysia 2024, a specialised conference and exhibition focusing on the theme ‘Operationalizing Water Transformation: New Strategies and Actions’, was held on 16th and 17th July 2024 at Wyndham Grand Bangsar Kuala Lumpur. This event was officiated by Deputy Prime Minister of Malaysia & Minister of Energy Transition and Water Transformation (PETRA) YAB Dato’ Sri…

  • Process Pump Testing

    Ebara Pumps Malaysia Sdn Bhd (EPM) welcomed visitors from Malaysia LNG Sdn Bhd for pump witness testing on 16 July 2024. Testing of Ebara Process Pump Type 40×25 IFW2013 (2 units) was conducted for performance test, running data, and outline dimension check. The results were found to be satisfactory.

  • Submersible Pump Testing

    Witness testing of Ebara submersible pump type DML was arranged on 9 July 2024 at Ebara Pumps Malaysia Sdn Bhd (EPM). Representatives from McCormick Global Ingredients Sdn Bhd, Meinhardt EPCM Sdn Bhd, Pembinaan Purcon Sdn Bhd, NK Fire Protection & Engineering Sdn Bhd, and Paxmax Engineering Sdn Bhd visited EPM and witnessed the performance testing…

  • Pump Testing

    On 21 June 2024, Ebara Pumps Malaysia Sdn Bhd (EPM) welcomed customer representatives from McK, Purcon, Meinhardt, NK Fire Protection & Engineering Sdn Bhd, and Arusjaya Timur Sdn Bhd for witness testing of Ebara centrifugal pump type 3M 65-160/11 (2 units). Pump performance were found to be satisfactory.

  • Motor Testing

    Ebara Pumps Malaysia Sdn Bhd (EPM) conducted a motor no load testing for customer representatives from Kapar Energy Ventures Sdn Bhd, Setia Mech Engineering Sdn Bhd, and Pump Era Sdn Bhd on 7 June 2024. Mechanical running test was performed on 110kW 2-pole motor for 150×125 CB2J 5110.

  • SWaM 2024 – Stormwater Management Resiliency: Solutions for the future

    National Conference on Stormwater Management – Stormwater Management Resiliency: Solutions for the future (SWaM 2024 Conference) was held on 28 & 29 May 2024 at Le Meridien, Putrajaya. Organized by the Malaysian Stormwater Organisation (MSO), this conference emphasizes on stormwater management for climate resiliency. Ebara Pumps Malaysia Sdn Bhd (EPM) participated in this event and…