Project: Ngoi-Ngoi 2 Water Treatment Plant, Negeri Sembilan
5 sets of EBARA 450×300 CJNM c/w 825kW Motor are installed in the Ngoi-Ngoi Phase 2 Water Treatment Plant (LRA) which is located in Ngoi-Ngoi, Seremban, Negeri Sembilan, Malaysia. It has a capacity of 150 million litres per day and serves over 80,000 users, ensuring long-term water supply security.
The facility was constructed to strengthen water supply in Seremban, Nilai, and Sendayan, addressing rising demand due to rapid regional development under Malaysia Vision Valley 2.0 (MVV2.0) and to ensure a steady supply of treated water for the next 20 years.
The plant complements the existing Ngoi-Ngoi Phase 1 plant in Sungai Terib, which was operating at full capacity with minimal reserve, thereby enhancing water security and supporting continued urban and industrial growth.



